« return to post

workmen

River Trent Catchment Board staff involved in the construction of a Half Tide Wall for the River Trent at West Butterwick, Lincolnshire, transporting ladle cooled slag; 1936 (RE/DOP/X/1/49)

River Trent Catchment Board staff involved in the construction of a Half Tide Wall for the River Trent at West Butterwick, Lincolnshire, transporting ladle cooled slag; 1936 (RE/DOP/X/1/49)

River Trent Catchment Board Drawing Office interior with male and female staff at workRiver Trent Catchment Board staff transporting ladle cooled slagRiver Trent Catchment Board Head Office on Derby Road during 'September Crisis 1938' showing front face protected with sandbagsRiver Trent Catchment Board Drawing Office interior with male and female staff at work, 1938Drawing Office staff